The Silk District Phase 2 reaches handover
The Silk District Phase 2 has reached handover point. The residential project, which is located in London’s…
09 Oct 2023Experience Loading
Suggestions: architecture engineering design
The Silk District Phase 2 has reached handover point. The residential project, which is located in London’s…
09 Oct 2023Brewer Smith Brewer Group (BSBG) is delighted to announce that the new campus for Misk Schools in Mohammed Bin…
02 Oct 2023Demolition works are now under way on the final phase of One Clapham, a residential development by Mount Anvil…
27 Sep 2023For better web experience, please use the website in portrait mode