Construction Update | One River Point
Construction at One River Point is now one year into the programme, with the residential tower reaching level…
06 Feb 2026Experience Loading
Suggestions: architecture engineering design
Construction at One River Point is now one year into the programme, with the residential tower reaching level…
06 Feb 2026In our second update from the UH by Ellington site, we join Director, Chris Day, and Senior Architectural…
29 Jan 2026Brewer Smith Brewer Group (BSBG) has announced its involvement in the development of the third phase of Friary…
21 Jan 2026With major project launches, award wins, and substantial construction progress across international markets,…
14 Dec 2025Flexible design relates to a building or a space crafted with a base build that can be repurposed, within…
02 Oct 2025Brewer Smith Brewer Group (BSBG) has announced its annual internal promotions for its staff, in recognition of…
01 Oct 2025For better web experience, please use the website in portrait mode